ZTE Corp.: Preconnectorized Solution Realizes Efficient ODN Deployment

March 23, 2021
To reduce the difficulty of optical cable splicing and improve construction efficiency, ZTE has developed a preconnectorized solution that includes a series of preconnectorized boxes and prefabricated optical cables.
To reduce the difficulty of optical cable splicing and improve construction efficiency, ZTE has developed a preconnectorized solution that includes a series of preconnectorized boxes and prefabricated optical cables. Besides the traditional optical distribution box functions, the preconnectorized box adds preconnectorized adapters on the outside. The prefabricated optical cable is the optical cable with a connector on the end of traditional optical cable. In network deployment, optical cable connections are completed by inserting the optical cable to the preconnectorized adapter, without the need for any fusion splicing operations.

Judge’s comment: “This product would no doubt be a time saver in the field; 'blind insertion' is an outstanding product feature."

Return to the 2021 Lightwave Innovation Reviews Honorees page

Sponsored Recommendations

March 10, 2025
The continual movement around artificial intelligence (AI) cluster environments is driving new sales of optical transceiver sales and the adoption of linear pluggable optics (...
March 25, 2025
Explore how government initiatives and industry innovations are transforming rural broadband deployments, overcoming cost and logistical challenges to connect underserved areas...
March 12, 2025
Join us for an engaging discussion with industry experts on the intersection of AI and optics. Moderated by Sean Buckley, editor-in-chief of Lightwave+BTR, this panel will explore...
April 10, 2025
The value of pluggable optics in open-line systems is also becoming more apparent. This webinar describes this trend and explores how such modules can best be employed. Register...