OFS intros V-Linx Spool & Play Solution for MDU deployments

Sept. 25, 2007
SEPTEMBER 25, 2007 -- According to the company, the V-Linx Solution can speed and simplify fiber installation in typical low, medium, or high-rise MDUs and reduce both labor cost and space by up to 50%.

SEPTEMBER 25, 2007 -- OFS (search for OFS) has announced the introduction of V-Linx Spool & Play Solution for fiber to the multiple-dwelling unit (search for MDU) deployments. Developed as a part of OFS' Access ADVANTAGE FTTH System, the V-Linx Solution can speed and simplify fiber installation in typical low, medium, or high-rise MDUs and reduce both labor cost and space by up to 50%, claim OFS representatives.

"The V-Linx Solution can help our customers deploy a full spectrum bend-optimized optical path to each MDU living unit faster, at a lower total cost, with less inventory," contends Bill Kloss, NAR president, Cable, Connectivity, and FTTx at OFS. "This solution demonstrates that OFS is committed to helping improve the ROI of MDU fiber deployments for carriers and deployments of all sizes," he adds.

According to the company, the V-Linx Solution includes four simple, yet innovative components that can flexibly adapt to nearly any MDU environment in both existing and new buildings, and all can be quickly deployed and connected in a plug-and-play manner. They are the EZ-Plug FDH, EZ-Spool Combiner, EZ-Spool Terminal, and EZ-Reach Drop assemblies. All V-Linx components are enabled by OFS' AllWave FLEX ZWP fiber, OFS' bend-optimized singlemode ZWP fiber.

The V-Linx Solution will be showcased in a display (booth 613) emulating a real MDU deployment and commercially available at the FTTH Conference 2007, to be held from September 30 � October 3, 2007 in Orlando, FL.


Visit OFS Optics.

Find more FTTx news at Lightwave's FTTx Resource Center.

Sponsored Recommendations

How AI is driving new thinking in the optical industry

Sept. 30, 2024
Join us for an interactive roundtable webinar highlighting the results of an Endeavor Business Media survey to identify how optical technologies can support AI workflows by balancing...

Advances in Fiber & Cable

Oct. 3, 2024
November 7, 2024 1:00 PM ET / 12:00 PM CT / 10:00 AM PT / 6:00 PM GMT Duration: 1 hour Already registered? Click here to log in. A certificate of attendance...

Advancing Data Center Interconnection

July 25, 2024
Data Center Interconnect (DCI) solutions provide physical or virtual network connections between remote data center locations. Connecting geographically dispersed data centers...

The AI and ML Opportunity

Sept. 30, 2024
Join our AI and ML Opportunity webinar to explore how cutting-edge network infrastructure and innovative technologies can meet the soaring demands of AI memory and bandwidth, ...